价值流程图VSM.ppt
《价值流程图VSM.ppt》由会员分享,可在线阅读,更多相关《价值流程图VSM.ppt(20页珍藏版)》请在第壹文秘上搜索。
1、Value Stream Mapping Train-the-TrainerInformation For A Process Data Box(to be collected on the shop floor) Cycle time Changeover time Process reliability (uptime) Scrap/Rework/Defect rate Number of product variations Number of operators Production batch sizes Working time (minus breaks) Pack size T
2、ypical Steps to Complete a Current State Drawing Document customer information Complete a quick walk through to identify the main processes (i.e., how many process boxes) Fill in data boxes, draw inventory triangles, and count inventory Document supplier information Establish information flow: how d
3、oes each process know what to make next? Identify where material is being pushed Quantify production leadtime vs. processing time Many shops have a combination of repetitive and non-repetitive products (indicating product families) Product families might be difficult to see focus on machines/operati
4、ons and work content time Engineering might be included in the information flow for leadtime impact, etc. Pitch is typically arbitrary to the manager Employment of pitch requires detailed knowledge of work content and routings for jobsFrequently Asked Questions: Make to Order and Engineer to Order S
5、hopsFAQ: Distribution Centers ExampleRECEIVESTOCKPICKPACKSHIP(Information flow on top)IIIIIFAQ: Parallel Manufacturing Flows Keep it simple, and make sure to leave room for the data boxes!FAQ: Including Subassemblies Focus on major subassemblies first Select one or two which might represent differen
6、t types of situationsGeneric vs. specific to the product familyOutsourced tasks within assembly Follow the format for parallel flow, and always include the main assembly process! For large fabricating and assembly operations, consider maps for each major subassembly with a “macro map” indicating the
7、 entire product family FAQ: Do We Really Have a Supermarket (or FIFO lane)? Supermarkets (and FIFO lanes) control production between points of flow without a written schedule.What is the trigger for production in this area of the value stream?Is the upstream process overproducing? If there is a sche
8、duling system present outside of a pure pull, chances are that there is no supermarket.FAQ: OutsourcingXYZCorporationI300 piecesMon+ WedI100 piecesMon+ WedC/T = 1 hourL/T = 3 daysBatch = Min. Batch = 3 Days60 min.2 days.7 daysFAQ: Long Processing Times vs. Production LeadtimesI300 piecesI100 piecesC
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 价值 流程图 VSM