1、中国对外承包工程商会颁布2019 版系列分包工程合同共有如下五套分包工程合同:(1) 2019版国际承包工程货物采购合同条件(中英文对照)CONTRACT CONDITIONS OF GOODS PURCHASE FORINTERNATIONALCONTRACTING WORKS(2 )2019版施工分包合同条件(适用于单价分包合同)(中英文对照)CONDITIONS OF CONTRACT FOR CONSTRUCTIONSUBCONTRACTS(applicable to unit price subcontracts)(3 )2019版施工分包合同条件(适用于总价分包合同)(中英文对照)
2、CONDITIONS OF CONTRACT FOR CONSTRUCTIONSUBCONTRACTS(applicable to lump sum subcontracts)(4 ) 2019版设计分包合同条件(中英文对照)SUBCONTRACT CONDITIONS FOR DESIGN(5 ) 2019版安装分包合同条件(中英文对照)CONDITIONS OF THE INSTALLATION SUBCONTRACT安装分包合同部分章节示例如下:10.4 不合格的材料和设备 10.4 Unqualified materials and equipment10.4.1 如分包商使用了不合格
3、的材料或设备,承包商有权指示分包商 予以处理,由此造成的一切损失由分包商负责。10.4.2 Provided that the Subcontractors use the substandard materials or equipment, the Contractor shall have the right to instruct it to dispose of the same and the Subcontractor shall be responsible for all damage caused thereby.10.4.3 如承包商的检查或检验结果表明分包商提供的材料或
4、设备不符 合合同要求时,承包商可以拒绝验收,并立即通知分包商予以更换。10.4.4 Provided that the Contractors inspection or examination shows that the materials or equipment supplied by the Subcontractor fail to conform to the requirements of the Contract the Contractor may refuse acceptance and immediately notify the Subcontractor to r
5、eplace the same.10.4.5 如检查或检验结果表明,承包商提供的材料和/或设备不符合合 同要求,分包商有权拒绝接收,并可要求承包商予以更换,由此增加的 费用和工期延误责任由承包商承担。10.4.6 Provided that the inspection or examination shows that the materials and/or equipment supplied by the Contractor fail to conform to the requirements of the Contract, theSubcontractor shall be e
6、ntitled to reject the same and may require the Contractor to make replacement thereof, the responsibility for any increase in cost and delay arising therefrom shall be borne by the Contractor.10.5 5 重新检验 10.5 Re-inspection不论何种原因,若承包商对以往的检验结果有疑问时,可以指示分包商 重新检验,分包商不得拒绝。如重新检验结果证明分包商提供的材料和 设备不符合分包合同要求,则应
7、由分包商承担重新检验的费用和工期延 误责任。若重新检验结果证明这些材料和工程设备符合合同要求,则应 由承包商承担重新检验的费用和工期延误责任。Ifz for whatever reason, the Contractor is in doubt about the results of a previous inspection, may instruct the re-inspection to be made by Subcontractor which shall not refuse to do so. Where the re-inspection proves these mate
8、rials and equipment fail to meet the requirements of the subcontract, the Subcontractor shall be liable for the cost of the re-inspection and the delay. Where the results of the re-inspection prove such materials and engineering equipment meet the requirements of the contract the Contractor shall be