1、燃机主变压器安装InstalIation of the GT main transformer施工作业指导书Construction Methodology作业项目名称:燃机主变压器安装Project name: installation of the GT main transformer专 业:电气Specialty: Electrical2020年11月10日November 10,2020目录 TabIe of Contents1、编制依据11、ReferenCe12、概述12、SUmmary13、主要工程量13、Main WOrk ClUantity14、作业条件24、Work Co
2、ndition25、作业方案35 Wdrk SCheme36、强制性条文执行内容136、COntent Of COmDUISOrV Dn)ViSionS Of engineering COnStnlCtion StandardS137、安全文明施工保障措施及风险控制计划表167、COntent Of COmDUlSorV ProViSionS Of engineering ConStnlCtiOn StandardS168、质量控制措施228、OUaHtV CongI measures229、绿色施工措施239、Green ConStrUCtiOn measures2310、应急保障措施23I
3、Oa EmergeeCy SUDDolI measures231、编制依据1 Reference1.1浙江设计院提供的本项目的相关图纸;1.1 Relevant drawings of this project provided by Zhejiang Design Institute2、概述2、Summary2.1本工程为:孟加拉国库尔纳330MW(200-300MW)双燃料联合循环电站项目,工作内容 主要包括燃机主变压器安装。The project is: Bangladesh Khulna 330MW(200-300MW)combined cycle (duel fuel) power
4、plant project, The work mainly includes the installation of the GT main transformer.3、主要工程量 Main work quantity3.1施工范围:燃机主变压器系统设备安装工程工程量统计如下:主要包括:变压器安装(主 变压器本体安装、主变压器检查、主变压器附件安装、主变压器注油及密封试验、主变压 器整体检查),变压器系统附属设备安装(中性点隔离开关安装、控制柜及端子箱检查安 装、软母线安装)。Construction scope: The GT main transformer system equipme
5、nt installation project is listed as follows: Mainly includes: transformer installation (main transformer body installation, main transformer inspection, main transformer accessory installation, main transformer oil injection and sealing test, main transformer overall inspection), transformer system
6、 Auxiliary equipment installation (neutral point disconnector installation, control cabinet and terminal box inspection installation, soft bus installation).3.2主要工作量主要工程量统计Major project statistics名称Name型号规格 Specifications单位 Unit数量 Quantity生产厂家 Manufacturer燃机主变Main transformer of Gas turbineDFZ-12600
7、/242 126MV 242/3 +812xl. 25%15. 75kv Ud=15%, YNdlSet4常州西电变压器有 限责任公司 CHANGZHOU XDsTransfbrmer Co.,Ltd.4.0 作业条件 Work condition主要设备交货条 件Major equipment delivery conditions燃机主变到货不影响安装施工。检查外观无掉漆、腐蚀和漏油现象。检查变压器高低压侧 方向及变压器氮气压力,应为0.010.03MPa,如压力不足,卸车后立即充氮。The arrival of GT equipment does not affect the insta