1、水运工程标准施工合同(第二部分中英文对照)总目录TABLEOFCONTENTS13工程质量EngineeringQuality14试验和检验Testingandinspection15 变更Change16 价格调整Priceadjustment17计量与支付Measurementandpayment18竣工验收Completionacceptance19 缺陷责任与保修责任Defectliabilityandwarrantyliability20 .保险Insurance21 .不可抗力ForceMajeure22 .违约Default23 .索赔Claims24 .争议的解决Dispute
2、Resolution25 其他约定Otherconventions部分章节示例如下:14试验和检验Testingandinspection14.1 材料、工程设备和工程的试验和检验Testandinspectionofmaterials,engineeringequipmentandworks14.1.4材料、构件、配件和工程设备订货前,承包人应向监理人提供生产厂家的生产许可证和相应资质证明文件等材料,对新材料、新产品还应提供鉴定证明和有关确认文件。Beforeorderingmaterials,components,accessoriesandengineeringequipment,the
3、contractorshallprovidethesupervisorwiththedatasuchasthemanufacturersproductionlicenseandcorrespondingqualificationcertificationdocuments.Fornewmaterialsandnewproducts,theyshallalsoprovideidentificationcertificatesandrelevantconfirmationdocuments.15.1变更的范围和内容Scopeandcontentofchanges(6)工程量清单中某单项工程量的变化
4、幅度超过20%,且对合同总价影响幅度超过2%时,应调整该工程量清单项目的综合单价。Thecomprehensiveunitpriceofthebillofquantitiesitemshallbeadjustedprovidedthatthechangeintheamountofasingleiteminthebillofquantitiesexceeds20%andimpactontotalcontractpriceexceeds2%,.15.5承包人的合理化建议Proposalforrationalizationofcontractors15.5.2承包人提出的合理化建议经实施后,按其节省
5、费用的一奖励承包人。Aftertherationalizationproposalputforwardbythecontractorisimplemented,thecontractorwillberewardedat%ofthecostsavings.16价格调整Priceadjustment16.1物价波动引起的价格调整Priceadjustmentcausedbypricefluctuations16.1.3物价波动引起的价格调整方法:Priceadjustmentmethodscausedbypricefluctuations:17计量与支付Measurementandpayment1
6、7.1 计量Measurement17.1.6承包人应将月度计量报表于每月一日前报监理人一式J分。Thecontractorshallsubmitthemonthlymeasurementreporttothesupervisorbeforethedayofeachmonth.17.2 预付款Advancepayment17.2.1 预付款Advancepayment17.2.1.1 施工合同签订生效28天内,或计划开工日期前,发包人向承包人支付不少于合同总价10%的工程预付款。Theemployershallpaythecontractoradvancepaymentofnotlesstha
7、n10%ofthetotalcontractpricewithin28daysofthesigningoftheconstructioncontract,orbeforetheplannedcommencementdate.17.2.3预付款的扣回与还清DedUCtionandrepaymentofadvancepayment17.2.3.1 当工程进度款累计支付比例达到合同总价的20%时,开始扣回预付款,工程进度款累计支付至80%时扣清,中间每期扣回比例相同。Whenthecumulativepaymentproportionoftheprojectprogresspaymentreach2
8、0%ofthetotalcontractpriceztheadvancepaymentwillbededucted.Whenthecumulativepaymentoftheprojectprogresspaymentreach80%zitwillbefullydeducted,samepercentageforintermediateperiod.17.3工程进度付款Projectprogresspayment17.3.5 工程进度款支付的方式和时间:按照月度工程计量的_%(不少于80%)支付;当工程款支付达到合同总价_%(不少于80%)时,停止支付;待工程全部竣工验收合格后支付至全部工程结