1、Synthetic platform detail introductionContentsWhy to build up synthetic platformSwitchgear making&breaking testing techniquesEnergy Sh-Lab synthetic platform structureWhy to build up synthetic platformBuild up a single phaseprototype based on theprevious experienceSubject it to short circuittest to
2、confirm the initialassumptionIntroduce modificationsbased on test results&repeat testthe requiredperformance of FPTCobtained?Build up 3 phase prototypethe requiredperformance of FPTCobtained?YesNoYesNoStandard development processProcess needs&limits from conventional test plant Single phase testing
3、accounts for 70%of the total development testingConventional test plant generator or network-Large,cumbersome to operate-Expensive-Difficult to make analysis if test failedThree phase short power needs for direct testingAbove table shows the three phase short circuit power that is required from the
4、primary source(generator or public network)to perform direct tests on MV CB for the IEC rated values.The approximate cost of a 2000MVA station powered by short circuit generator is 200 million RMB.8 8101012.512.516162020252531.531.5404036500620780100012501600200025002433042052067083010001300170017.5
5、250305380490605760950120012170210260330420520660850Voltage(kV)Voltage(kV)Current(kA)Current(kA)Three phase short power(MVA)for direct testingThree phase short power(MVA)for direct testingPrinciple of synthetic test Divide short-circuit breaking into 2 phases to reduce necessary power High current ph
6、ase(short-circuit)High voltage phase(Transient recovery voltage)High current phase:supply the short circuit test current from a source of much lower voltage than the breaker rated voltage High voltage phase:provide voltage stress after interruption from a low power high voltage sorce Synthetic lab i
7、s thus composed of 2 banks A high current one A high voltage one with good time coordination between both 1 msSeparation sufficient to withstand TRVsopening of contactstExtinction of arcAdvantage of synthetic testingEffectiveness:Widely accepted as an equivalent method as direct testing.Efficiency:P
8、roducing large number of tests quickly.Economic:Significant cost reduction on the installation compare with the cost of power source needed for direct testing.Easy to operate and maintain.Protection of prototype under test:Significantly reduction of damage to the prototype even if the test failed.Co