石油化工建设工程项目监理规范中表格不符行业规定问题解析.docx
《石油化工建设工程项目监理规范中表格不符行业规定问题解析.docx》由会员分享,可在线阅读,更多相关《石油化工建设工程项目监理规范中表格不符行业规定问题解析.docx(16页珍藏版)》请在第壹文秘上搜索。
1、SH/T3903-A.1工程动工/复工报审表WorksCommencementZResumptionApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)Tb(CS/CMC)我单位承担的匚程,已完毕了如下各项工作,具有了口动工/口复工条件,特此申请施工,请核查并签发口动工/口复工指令。Wehavefulfilledthefollowingactivitiesfortheworkcontractedbyus,theworkscommencement/worksresumptionconditionsareavailable,thereforetheconst
2、ructionisappliedhereby,pleasereviewandissueworkscommencement/worksresumptionorders.附Attached:1 动工汇报commencementReport;2 证明文献Supportingdocumentso项目经理ProjectManager承包单位(章)日期Contractor(Chop)Date审查意见ReviewComments:总监理工程师ChiefSupervisionEngineer项目监理机构日期CS/CMCDateSH/T3903-A.2施工组织设计(方案)报审表ConstructionOrgan
3、izationDesignApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)Tb(CS/CMC)我方已根据施工承包协议的有关规定完毕了工程施工组织设计(方案)的编制,并经我单位技术负责人审查同意,请予以审查。Accordingtotherelatedregulationsoftheconstructioncontract,wehavecompletedthepreparationoftheconstructionorganizationdesign,andithasbeenreviewedandapprovedbythetechnicalrespons
4、iblepeopleofourcompany,pleasereviewit.附Attached:口施工组织设计/口施工方案。ConstructionOrganizationDesignConstructionPlan0项目经理ProjectManager承包单位(章)日期Contractor(Chop)Date专业监理工程师审查意见Reviewcommentsfromdisciplinesupervisionengineer:专业监理工程师DisciplineSupervisionEngineer日期Date总监理工程师审核意见Reviewcommentsfromchiefsupervisio
5、nengineer:总监理工程师ChiefSupervisionEngineer项目监理机构日期CS/CMCDateSH/T3903-A.3分包单位资格报审表SubcontractorQualificationApprovalRequest工程名称WorksTitle:编号ItemNo:致(监理单位)To(CS/CMC)经考察,我方认为拟选择的(分包单位)具有承担下列工程H勺施工资质和施工能力,可以保证本工程项目按协议Fl勺规定进行施工。分包后,我方仍承担承包协议口勺所有责任。请予以审查和同意。Afterinvestigation,wethinktheproposed(subcontracto
6、r)hasthequalicationandcapabilityforcontractingthefollowingworks,andcanassurethatthisworkswillbeconstructedasperthecontractregulations.Aftersubcontractingthisworks,westillholdthewholeresponsibilitiesofthelumpsumcontractor.Pleasereviewandapproveit.附Attached:1 分包单位资质材料SubcontractorQualificationDocument
7、s:2 分包单位业绩材料SubcontractorPerformanceDocumentSo分包工程名称(部位)Subcontractedworks(Location)工程数量WorksQuantity拟分包工程协议额Contractpriceofproposedsubcontractedworks分包工程占所有工程Percentageofsubcontractedworks合计TOtalS项目经理Projectmanager承包单位(章)日期Contractor(Chop)Date专业监理工程师审查意见Reviewcommentsfromdisciplinesupervisionengine
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 石油化工 建设 工程项目 监理 规范 表格 不符 行业 规定 问题 解析